Please check an answer for every question.
Cookie settings

We use cookies to personalise content, to provide social media features and to analyse
our traffic. We also share information about your use on our site with our socal media and analytics partners
who may combine it with other information that you've provided to them
or that they've collected from your use of their services.

Enabling this cookie category allows you to establish statistics of traffic on the site. Disabling them prevents us from monitoring and improving the quality of our services.
Our website may contain sharing buttons to social networks that allow you to share our content on these social networks. When you use these sharing buttons, a link is made to the servers of these social networks and a third-party cookie is installed after obtaining your consent.
Enabling this cookie category would allow our partners to display more relevant ads based on your browsing and customer profile. This choice has no impact on the volume of advertising.

Gryphon description

The Gryphon field is in Quad 9 and is located approximately 175 miles north east of Aberdeen at a water depth of 112m. It is primarily in block 9/18b although a small portion extends into 9/18a. The field was discovered in 1987 with first production in October 1993. Oil production peaked in 1995 ca. 40,000bbl/d. It is serviced by the Gryphon floating production, storage and offloading facility (FPSO) which also has subsea tiebacks from both Maclure and Tullich developments.

In 2011 Gryphon was put into dry dock for extensive upgrades and production was re-started in May 2013. The oil is exported by tanker.  Gas is exported via a pipeline to Beryl Alpha, where it is transported to shore via the SAGE system.

 

FPSO vessel data:

  • Length  - 257.6m
  • Beam – 40.98m
  • Depth – 23.61m
  • Draft, design + scantling – 12.7 – 16.5m
  • Displacement – 126,663 tonnes (@16.5m draft)