Skip to content
Please check an answer for every question.
Cookie settings

Total may deposit the following categories of cookies: Cookies for statistics, targeted advertising and social networks. You have the possibility to disable these cookies, these settings will only be valid on the browser you are currently using.

Enabling this cookie category allows you to establish statistics of traffic on the site. Disabling them prevents us from monitoring and improving the quality of our services.
Our website may contain sharing buttons to social networks that allow you to share our content on these social networks. When you use these sharing buttons, a link is made to the servers of these social networks and a third-party cookie is installed after obtaining your consent.
Enabling this cookie category would allow our partners to display more relevant ads based on your browsing and customer profile. This choice has no impact on the volume of advertising.

Services we provide

We offer the following services to third-party tie-ins:

 

  • Make available capacity to Tie-in parties;
  • Accept gas and condensate that comply with delivery specifications;
  • Process gas and condensate to required criteria;
  • Meter / measure / allocate gas and condensate to specified standards;
  • Deliver dry gas into the SIRGE system;
  • Operate / monitor fields on behalf of Tie-in parties;
  • Provide technical input as required.
  • Provide other 'routine' service.
  • Provide other 'non-routine' services on a cost-plus basis.
  • Deliver condensate to SVT

Any approach would be treated on a case-by-case basis when determining the appropriate commercial terms, taking into account issues such as the required level of capital expenditure, product specification, capacity requirements, etc

Performance And reliability

Greater Laggan Area has a proven record of a high level of Operating Efficiency demonstrated in the graph below (2016 to YTD August 2019). The GLA strives for a high rate of Operating Efficiency with plant turnarounds being planned for optimal maintenance and strategic workscopes to be safely undertaken in the forecast timeframe.

 

Greater Laggan performance