Ullage profiles
The ullage in the various components of the Elgin/Franklin transportation and processing system is given in the following sections. The ullage is based on the Operator’s best estimates at the time of publishing. Ullages for the SEAL terminal, Forties System and GAEL pipeline are provided by the respective system operators.
The traffic light system is used to communicate ullage as follows:
Ullage as % of system capacity | |
---|---|
<5% |
![]() |
5% to 25% |
![]() |
>25% |
![]() |
Elgin PUQ
The ullage profile for the different components of the Elgin PUQ is as follows:
Capacity | 2018 | 2019 | 2020 | 2021 | 2022 | 2023 | 2024 | 2025 | 2026 | 2027 | |
---|---|---|---|---|---|---|---|---|---|---|---|
Oil export |
175,000 bbl/d |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
Gas Compression | 15.5 Msm3/d |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
Gas Export | 15.5 Msm3/d |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
Gas Lift | Nil * |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
Produced Water Handling | 4,000 m3/d * |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
Dehydration | 15.5 Msm3/d |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
H2S Removal | 15.5 Msm3/d |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
Water Injection | Nil * |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
Power Generation MW | 31MW |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
*Future modifications may increase capacity/ullage.
other infrastructure
The estimate of ullage for other infrastructure used by the Elgin/Franklin complex is maintained by the system operators for those systems as follows: